text: >
For the factory hall we used more than
500 m³ of concrete and 197,000 kg of
steel construction. LED light lines
ensure that there is sufficient light at
all times, in addition to the natural
light that falls through the skylights.
6 crane tracks have also been installed
in the hall.
_fieldset: bodytext
-
img: _mg_5750.jpg
_fieldset: fullscreen_image
-
img: _mg_5785.jpg
_fieldset: fullscreen_image
-
order: "0"
leftsize: large
rightsize: small
leftimg: _mg_5787.jpg
rightimg: ""
lefttext: ""
righttext: |
* _Architect_ ** Erwin Jonkman **
* _Oppervlakte_ ** 3.300 m² **
* _Oplevering_ ** 2018 **
* _Locatie_ ** Heerhugowaard **
* _Opdrachtgever_ **Gevelelementen Noord-Holland**
_fieldset: duo